Thursday, March 12, 2015

Stair Dormer Progress


  The dormer is progressing. Wrapped up for enduring winter (it held up nicely with no leaks) The dormer and the new window is ready for some finish work with trim and flashing.
  Here is the inside view. The dormer is all insulated and ready for drywall and finish work. It provides much more light and a better view of the yard. Now on to the stairs.....

Thursday, March 5, 2015

Some New Beams and Organization


   I have finished replacing the beams (technically cross-ties) in the ceiling and installing foam insulation. The house is now noticeably warmer and the new beams are much stronger and better looking. In the process of clean up I needed to set all the tools out of the way and it came out a bit more organized than usual.
  Here are two of the beams installed. A little smoothing and some finish and they should be good for another 100 years.



Tuesday, October 28, 2014

Let there be Light. . .Upstairs.

Everything is intricately linked so simply redoing the roof was not going to happen as dormers needed to be added on both sides of the house. Our house is a 1.5 story house which means the sloped roof limits use upstairs and as we are adding a bathroom upstairs we needed to create ceiling space for a shower. I have no plans on taking showers sitting down.

It doesn't look like much today but here's our new bathroom!! Nice view of the forest.


Skip begins to create the dormer.


I am certain he is breaking a few codes regarding safety but so far so good. I will be very happy when all the roofing is done and I get him down on the ground again.


The almost finished product!


On the front of the house we are placing the stairs up against the wall in the living room which brings up upstairs just under the eaves of the roof upstairs. Skip, being the tall man that he is, is sick and tired of always having to duck to avoid hitting his head. To ensure that the house fits him, a dormer was added to allow for head clearance as he ascends and descends the stairs.

A small dormer already existed but we wanted it to cover a bigger area of the roof to let more light in and give a longer stretch of head room.


The destruction and reconstruction under way.


We are thankful that it has been a mild fall so far as big giant holes in the roof can make for a very cold house. 


Now Skip just needs to add the window (and the siding, metal roof and a few other things but we wont go there today). 


All of the old tar paper has now been covered by the new roofing material, making our roof completely water proof again!

The windows added upstairs will obviously allow for a nice addition of light. Lastly, Skip will also add a skylight on each side of the roof to the left of the chimney to let light into the two new bedrooms that are being added upstairs.

Tuesday, September 30, 2014

Ignoring Traditions and Going Metal

Tile roofs are very common in Sweden and this has led to many discussions with family, friends and neighbors as Skip is sort of. . .well. . .fully against them. I am still not entirely sure why he feels so strongly about it but part of the remodel definitely includes changing the tile roof to a metal roof and I will not stand in the way.


This should look familiar by this time but a lot has changed since this picture was taken. 
We had some help from a newly "imported" American, Josh, to remove the tiles from this side of the house as part of putting up a new roof on the entryway.

A bit of rot was uncovered once the tiles were removed but at least only a small section was affected.


After a little work the affected area was removed and replaced with new boards. Just like a surgical intervention. 


The whole roof was then covered with a waterproof alsphalt-impregnated polyester mat. 


Skip hard at work!

We just have to wait for the chimney guys to come and fix our chimney now so that we can get the other side done and then place the metal roof on top. I have faith that they will come on Thursday as promised but if we have learned something from talking to neighbors and friends it is that Swedish carpenters/plummers/electricians are not always so reliable. Let's just say I hope that I will be doing a post soon about our new fireplace and chimney!

It is also nice that not much goes to waste. The tiles have already been placed on a roof on a new building our neighbor built on his property. 

Pictures of the finished roof will hopefully be seen within the next few weeks! We keep checking the weather forcast and so far we are in for an amazing fall here in Sweden which is helping Skip a lot.